Grid
Ballinderry Road Solar Phase 1 (Li…: 13.5 MW Solar PV | Grid

Ballinderry Road Solar Phase 1 (Lisburn)

Solar PVOperational

Grid ID ast_05614a364d0f3cec

View on map

What is Ballinderry Road Solar Phase 1 (Lisburn), and what is its status?

Solar PV in Northern Ireland. Details below come from the sources listed for each field.

Capacity

13.5 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

54.51814, -6.09940

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2236

    Ballinderry Road Solar Phase 1 (Lisburn) in REPD.

  • DUKES site

    SOL-001254

    Lisburn in DUKES.

  • Same site

    coordinate group

    Same site in both registers, matched by coordinate group (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Hadstone Energy/Island Green Power

    REPD records 2236 as the operator.

  • Operator · DUKES

    Greencoat Capital

    DUKES records SOL-001254 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Ballinderry Road Solar Phase 1 (Lisburn)

    REPD · 2236 · Hadstone Energy/Island Green Power · Northern Ireland · Co. Antrim

  • Lisburn

    DUKES · SOL-001254 · Greencoat Capital · Northern Ireland

Change history

  • May 2026

    30 Jul 2026 · DUKES · 20.5 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 13.5 MW · Counted

Source records