Grid
Great Hele Farm AD farm …: 1.3 MW Anaerobic digestion | Grid

Great Hele Farm AD farm waste

Anaerobic digestionOperational

Grid ID ast_08912a4dc93430f9

View on map

What is Great Hele Farm AD farm waste, and what is its status?

Anaerobic digestion in South West England. Details below come from the sources listed for each field.

Capacity

1.3 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

51.00507, -3.82381

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    345

    Great Hele Farm AD farm waste in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Greener for Life Energy

    REPD records 345 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Great Hele Farm AD farm waste

    REPD · 345 · Greener for Life Energy · South West · Devon

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 1.3 MW · Counted

Source records