Capacity
4.7 MW
Grid ID ast_09ea47dd37d2e7fc
What is Turves/Burtnhouse Solar Farm Extension, and what is its status?
Solar PV in East England. Details below come from the sources listed for each field.
4.7 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
2171
Turves/Burtnhouse Solar Farm Extension in REPD.
DUKES site
SOL-000735
Burnthouse in DUKES.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 245 m.
Operator · REPD
Lightsource Renewable Energy
REPD records 2171 as the operator.
Operator · DUKES
Lightsource BP
DUKES records SOL-000735 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Turves/Burtnhouse Solar Farm Extension
REPD · 2171 · Lightsource Renewable Energy · Eastern · Cambridgeshire
Burnthouse
DUKES · SOL-000735 · Lightsource BP · East of England
May 2026
30 Jul 2026 · DUKES · 4.8 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 4.7 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026