Grid
Turves/Burtnhouse Solar Farm Extens…: 4.7 MW Solar PV | Grid

Turves/Burtnhouse Solar Farm Extension

Solar PVOperational

Grid ID ast_09ea47dd37d2e7fc

View on map

What is Turves/Burtnhouse Solar Farm Extension, and what is its status?

Solar PV in East England. Details below come from the sources listed for each field.

Capacity

4.7 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.52950, -0.02620

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2171

    Turves/Burtnhouse Solar Farm Extension in REPD.

  • DUKES site

    SOL-000735

    Burnthouse in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 245 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Lightsource Renewable Energy

    REPD records 2171 as the operator.

  • Operator · DUKES

    Lightsource BP

    DUKES records SOL-000735 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Turves/Burtnhouse Solar Farm Extension

    REPD · 2171 · Lightsource Renewable Energy · Eastern · Cambridgeshire

  • Burnthouse

    DUKES · SOL-000735 · Lightsource BP · East of England

Change history

  • May 2026

    30 Jul 2026 · DUKES · 4.8 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 4.7 MW · Counted