Capacity
1.2 MW
Grid ID ast_0a69152c37e0b4be
What is Pennington Recycling Centre, and what is its status?
Solar PV in Southern England. Details below come from the sources listed for each field.
1.2 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
5407
Pennington Recycling Centre in REPD.
DUKES site
SOL-001624
Pennington in DUKES.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.
Operator · REPD
Novus Solar Developments
REPD records 5407 as the operator.
Operator · DUKES
Anesco
DUKES records SOL-001624 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Pennington Recycling Centre
REPD · 5407 · Novus Solar Developments · South East · Hampshire
Pennington
DUKES · SOL-001624 · Anesco · South East
May 2026
30 Jul 2026 · DUKES · 1.2 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 1.2 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026