Eye Biomass Plant: 14.3 MW Biomass, East England | Grid

Eye Biomass Plant

BiomassOperational

Grid ID ast_0ddb56c64f64bf64

View on map

What is Eye Biomass Plant, and what is its status?

Biomass in East England. Details below come from the sources listed for each field.

Capacity

14.3 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.33344, 1.12776

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    82

    Eye Biomass Plant in REPD.

  • DUKES site

    BIO-000134

    EPR Eye Ltd in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 212 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    South Western Power (NOVERA)

    REPD records 82 as the operator.

  • Operator · DUKES

    EPR

    DUKES records BIO-000134 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Eye Biomass Plant

    REPD · 82 · South Western Power (NOVERA) · Eastern · Suffolk

  • EPR Eye Ltd

    DUKES · BIO-000134 · EPR · East of England