Capacity
5.0 MW
Grid ID ast_11dc3b45362990a2
What is Outwood Farm (Phase 1), and what is its status?
Solar PV in East England. Details below come from the sources listed for each field.
5.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
DUKES site
SOL-001028
Outwood in DUKES.
REPD reference
2240
Outwood Farm (Phase 1) in REPD.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 867 m.
Operator · DUKES
Greencoat Capital
DUKES records SOL-001028 as the operator.
Operator · REPD
MS Power Projects
REPD records 2240 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Outwood
DUKES · SOL-001028 · Greencoat Capital · East of England
Outwood Farm (Phase 1)
REPD · 2240 · MS Power Projects · Eastern · Essex
May 2026
30 Jul 2026 · DUKES · 5.0 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 5.0 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026