Grid
Allerton Waste Recovery …: 1.1 MW Anaerobic digestion | Grid

Allerton Waste Recovery Park (Waste AD)

Anaerobic digestionOperational

Grid ID ast_1476fb3a8be556b2

View on map

What is Allerton Waste Recovery Park (Waste AD), and what is its status?

Anaerobic digestion in North East England. Details below come from the sources listed for each field.

Capacity

1.1 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

54.03258, -1.38050

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    368

    Allerton Waste Recovery Park (Waste AD) in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    AmeyCespa

    REPD records 368 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Allerton Waste Recovery Park (Waste AD)

    REPD · 368 · AmeyCespa · Yorkshire and Humber · North Yorkshire

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 1.1 MW · Counted

Source records