Grid
Altahullion Phase II: 11.7 MW Onshore wind | Grid

Altahullion Phase II

Onshore windOperational

Grid ID ast_15059110b8789c0a

View on map

What is Altahullion Phase II, and what is its status?

Onshore wind in Northern Ireland. Details below come from the sources listed for each field.

Capacity

11.7 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

54.97019, -6.99955

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    WON-000315

    Altahullion Extension Wind Farm (NI) in DUKES.

  • REPD reference

    3244

    Altahullion Phase II in REPD.

  • Same site

    name

    Same site in both registers, matched by name (high). REPD megawatts count. Distance 2354 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    RES Group

    DUKES records WON-000315 as the operator.

  • Operator · REPD

    B9 Energy / RES

    REPD records 3244 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Altahullion Extension Wind Farm (NI)

    DUKES · WON-000315 · RES Group · Northern Ireland

  • Altahullion Phase II

    REPD · 3244 · B9 Energy / RES · Northern Ireland · Co. Derry / Londonderry

Change history

  • May 2026

    30 Jul 2026 · DUKES · 11.7 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 11.7 MW · Counted

Source records