Grid
Stormy Down (Waste AD): 3 MW Anaerobic digestion | Grid

Stormy Down (Waste AD)

Anaerobic digestionOperational

Grid ID ast_183f548adef8d9f5

View on map

What is Stormy Down (Waste AD), and what is its status?

Anaerobic digestion in South Wales. Details below come from the sources listed for each field.

Capacity

3.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

51.50723, -3.67134

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    4786

    Stormy Down (Waste AD) in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Severn Trent (formerly Agrivert)

    REPD records 4786 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Stormy Down (Waste AD)

    REPD · 4786 · Severn Trent (formerly Agrivert) · Wales · Mid Glamorgan

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 3.0 MW · Counted

Source records