Capacity
7.5 MW
Grid ID ast_1b3d45a92c19b327
What is Clapham solar farm, and what is its status?
Solar PV in East England. Details below come from the sources listed for each field.
7.5 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
1947
Clapham solar farm in REPD.
DUKES site
SOL-000927
Clapham in DUKES.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.
Operator · REPD
SBC Renewables
REPD records 1947 as the operator.
Operator · DUKES
WPO UK Services
DUKES records SOL-000927 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Clapham solar farm
REPD · 1947 · SBC Renewables · Eastern · Bedfordshire
Clapham
DUKES · SOL-000927 · WPO UK Services · East of England
May 2026
30 Jul 2026 · DUKES · 5.0 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 7.5 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026