Clapham solar farm: 7.5 MW Solar PV, East England | Grid

Clapham solar farm

Solar PVOperational

Grid ID ast_1b3d45a92c19b327

View on map

What is Clapham solar farm, and what is its status?

Solar PV in East England. Details below come from the sources listed for each field.

Capacity

7.5 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.17675, -0.48436

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    1947

    Clapham solar farm in REPD.

  • DUKES site

    SOL-000927

    Clapham in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    SBC Renewables

    REPD records 1947 as the operator.

  • Operator · DUKES

    WPO UK Services

    DUKES records SOL-000927 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Clapham solar farm

    REPD · 1947 · SBC Renewables · Eastern · Bedfordshire

  • Clapham

    DUKES · SOL-000927 · WPO UK Services · East of England

Change history

  • May 2026

    30 Jul 2026 · DUKES · 5.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 7.5 MW · Counted

Source records