Capacity
30.0 MW
Grid ID ast_1daf33f899c46d66
What is Lakeside EfW, and what is its status?
Energy from waste in Southern England. Details below come from the sources listed for each field.
30.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
865
Lakeside EfW in REPD.
Operator · REPD
Grundon Waste / Viridor
REPD records 865 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Lakeside EfW
REPD · 865 · Grundon Waste / Viridor · South East · Buckinghamshire
REPD Q2 2026
3 Aug 2026 · REPD · 30.0 MW · Counted
REPD
REPD Q2 2026