Ford Farm (Ashurst): 10 MW Solar PV | Grid

Ford Farm (Ashurst)

Solar PVOperational

Grid ID ast_22629c2b9c88e117

View on map

What is Ford Farm (Ashurst), and what is its status?

Solar PV in South East England. Details below come from the sources listed for each field.

Capacity

10.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

50.94284, -0.32228

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    1531

    Ford Farm (Ashurst) in REPD.

  • DUKES site

    SOL-000999

    Ford in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 232 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Conergy

    REPD records 1531 as the operator.

  • Operator · DUKES

    Greencoat Capital

    DUKES records SOL-000999 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Ford Farm (Ashurst)

    REPD · 1531 · Conergy · South East · West Sussex

  • Ford

    DUKES · SOL-000999 · Greencoat Capital · South East

Change history

  • May 2026

    30 Jul 2026 · DUKES · 11.6 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 10.0 MW · Counted