Grid
Bishopthorpe: 16.4 MW Onshore wind, Yorkshire | Grid

Bishopthorpe

Onshore windOperational

Grid ID ast_2282104658df25c6

View on map

What is Bishopthorpe, and what is its status?

Onshore wind in Yorkshire. Details below come from the sources listed for each field.

Capacity

16.4 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.50992, -0.00073

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    4256

    Bishopthorpe in REPD.

  • DUKES site

    WON-001163

    Bishopthorpe in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Greencoat UK (formerly BayWa r.e.)

    REPD records 4256 as the operator.

  • Operator · DUKES

    Greencoat Capital

    DUKES records WON-001163 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Bishopthorpe

    REPD · 4256 · Greencoat UK (formerly BayWa r.e.) · East Midlands · Lincolnshire

  • Bishopthorpe

    DUKES · WON-001163 · Greencoat Capital · East Midlands

Change history

  • May 2026

    30 Jul 2026 · DUKES · 16.4 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 16.4 MW · Counted

Source records