Grid
Sheringham Shoal: 317 MW Offshore wind, Offshore | Grid

Sheringham Shoal

Offshore windOperational

Grid ID ast_233b258d8e078788

View on map

What is Sheringham Shoal, and what is its status?

Offshore wind in Offshore. Details below come from the sources listed for each field.

Capacity

317.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.13532, 1.14792

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2512

    Sheringham Shoal in REPD.

  • DUKES site

    WOF-000457

    Sheringham Shoal BMU 2 in DUKES.

  • DUKES site

    WOF-000456

    Sheringham Shoal BMU 1 in DUKES.

  • Same site

    name group

    Same site in both registers, matched by name group (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Equinor

    REPD records 2512 as the operator.

  • Operator · DUKES

    Scira Offshore Energy

    DUKES records WOF-000457 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Sheringham Shoal

    REPD · 2512 · Equinor · Offshore · Offshore

  • Sheringham Shoal BMU 2

    DUKES · WOF-000457 · Scira Offshore Energy · East of England

  • Sheringham Shoal BMU 1

    DUKES · WOF-000456 · Scira Offshore Energy · East of England

Change history

  • May 2026

    30 Jul 2026 · DUKES · 158.0 MW · Not counted

  • May 2026

    30 Jul 2026 · DUKES · 158.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 317.0 MW · Counted

Source records