Capacity
4.4 MW
Grid ID ast_264a4bc8db863813
What is Langton Farm Solar park, and what is its status?
Solar PV in South Wales. Details below come from the sources listed for each field.
4.4 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
1661
Langton Farm Solar park in REPD.
DUKES site
SOL-000867
Langton (FIT) in DUKES.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.
Operator · REPD
Lightsource Renewable Energy
REPD records 1661 as the operator.
Operator · DUKES
Lightsource BP
DUKES records SOL-000867 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Langton Farm Solar park
REPD · 1661 · Lightsource Renewable Energy · Wales · Dyfed
Langton (FIT)
DUKES · SOL-000867 · Lightsource BP · Wales
May 2026
30 Jul 2026 · DUKES · 4.3 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 4.4 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026