Hornsea 2 - Optimus and Breesea: 1.3 GW Offshore wind | Grid

Hornsea 2 - Optimus and Breesea

Offshore windOperational

Grid ID ast_26fde3b00e4ab5f8

View on map

What is Hornsea 2 - Optimus and Breesea, and what is its status?

Offshore wind in Offshore. Details below come from the sources listed for each field.

Capacity

1,320.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.96000, 1.53999

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2502

    Hornsea 2 - Optimus and Breesea in REPD.

  • DUKES site

    WOF-001365

    Hornsea 02 in DUKES.

  • Same site

    name

    Same site in both registers, matched by name (medium). REPD megawatts count. Distance 32194 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Orsted (formerly Dong Energy)

    REPD records 2502 as the operator.

  • Operator · DUKES

    Orsted

    DUKES records WOF-001365 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Hornsea 2 - Optimus and Breesea

    REPD · 2502 · Orsted (formerly Dong Energy) · Offshore · Offshore

  • Hornsea 02

    DUKES · WOF-001365 · Orsted · East Midlands

Change history

  • May 2026

    30 Jul 2026 · DUKES · 1,386.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 1,320.0 MW · Counted