Capacity
2.4 MW
Grid ID ast_4609ac006e8c5811
What is May Farm Anaerobic Digester (Farm AD), and what is its status?
Anaerobic digestion in East England. Details below come from the sources listed for each field.
2.4 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
273
May Farm Anaerobic Digester (Farm AD) in REPD.
Operator · REPD
Barway Farms /Shropshire Energy
REPD records 273 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
May Farm Anaerobic Digester (Farm AD)
REPD · 273 · Barway Farms /Shropshire Energy · Eastern · Cambridgeshire
REPD Q2 2026
3 Aug 2026 · REPD · 2.4 MW · Counted
REPD
REPD Q2 2026