Grid
May Farm Anaerobic Diges…: 2.4 MW Anaerobic digestion | Grid

May Farm Anaerobic Digester (Farm AD)

Anaerobic digestionOperational

Grid ID ast_4609ac006e8c5811

View on map

What is May Farm Anaerobic Digester (Farm AD), and what is its status?

Anaerobic digestion in East England. Details below come from the sources listed for each field.

Capacity

2.4 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.45465, 0.35208

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    273

    May Farm Anaerobic Digester (Farm AD) in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Barway Farms /Shropshire Energy

    REPD records 273 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • May Farm Anaerobic Digester (Farm AD)

    REPD · 273 · Barway Farms /Shropshire Energy · Eastern · Cambridgeshire

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 2.4 MW · Counted

Source records