Grid
Tangy Wind Farm/Tangy 1: 12.8 MW Onshore wind | Grid

Tangy Wind Farm/Tangy 1

Onshore windOperational

Grid ID ast_4a2beb42be74a86b

View on map

What is Tangy Wind Farm/Tangy 1, and what is its status?

Onshore wind in North Scotland. Details below come from the sources listed for each field.

Capacity

12.8 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

55.49529, -5.66658

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    3467

    Tangy Wind Farm/Tangy 1 in REPD.

  • DUKES site

    WON-000235

    Tangy Wind Farm - A in DUKES.

  • Same site

    name group

    Same site in both registers, matched by name group (medium). REPD megawatts count. Distance 2445 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Border Wind / Scottish and Southern (SSE)

    REPD records 3467 as the operator.

  • Operator · DUKES

    SSE Group

    DUKES records WON-000235 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Tangy Wind Farm/Tangy 1

    REPD · 3467 · Border Wind / Scottish and Southern (SSE) · Scotland · Strathclyde

  • Tangy Wind Farm - A

    DUKES · WON-000235 · SSE Group · Scotland

Change history

  • May 2026

    30 Jul 2026 · DUKES · 18.5 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 12.8 MW · Counted