Offshore windOperational

Grid ID ast_4d8acee75b7a2c42

View on map

What is Dudgeon East, and what is its status?

Offshore wind in Offshore. Details below come from the sources listed for each field.

Capacity

402.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.11746, 0.61347

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2538

    Dudgeon East in REPD.

  • DUKES site

    WOF-001142

    Dudgeon BMU 4 in DUKES.

  • DUKES site

    WOF-001136

    Dudgeon BMU 1 in DUKES.

  • DUKES site

    WOF-001140

    Dudgeon BMU 2 in DUKES.

  • DUKES site

    WOF-001141

    Dudgeon BMU 3 in DUKES.

  • Same site

    name group

    Same site in both registers, matched by name group (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Statoil / Statkraft

    REPD records 2538 as the operator.

  • Operator · DUKES

    Scira Offshore Energy

    DUKES records WOF-001142 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Dudgeon East

    REPD · 2538 · Statoil / Statkraft · Offshore · Offshore

  • Dudgeon BMU 4

    DUKES · WOF-001142 · Scira Offshore Energy · East of England

  • Dudgeon BMU 1

    DUKES · WOF-001136 · Scira Offshore Energy · East of England

  • Dudgeon BMU 2

    DUKES · WOF-001140 · Scira Offshore Energy · East of England

  • Dudgeon BMU 3

    DUKES · WOF-001141 · Scira Offshore Energy · East of England

Change history

  • May 2026

    30 Jul 2026 · DUKES · 102.0 MW · Not counted

  • May 2026

    30 Jul 2026 · DUKES · 90.0 MW · Not counted

  • May 2026

    30 Jul 2026 · DUKES · 108.0 MW · Not counted

  • May 2026

    30 Jul 2026 · DUKES · 102.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 402.0 MW · Counted