Race Bank (Phase 1): 290 MW Offshore wind | Grid

Race Bank (Phase 1)

Offshore windOperational

Grid ID ast_5b526ad9c1c70f86

View on map

What is Race Bank (Phase 1), and what is its status?

Offshore wind in East of England. Details below come from the sources listed for each field.

Capacity

289.8 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.13597, 0.58917

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    WOF-001256

    Race Bank in DUKES.

  • REPD reference

    2515

    Race Bank (Phase 1) in REPD.

  • Same site

    coordinate group

    Same site in both registers, matched by coordinate group (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Orsted

    DUKES records WOF-001256 as the operator.

  • Operator · REPD

    Orsted (formerly Dong Energy)/ Macquarie Group

    REPD records 2515 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Race Bank

    DUKES · WOF-001256 · Orsted · East of England

  • Race Bank (Phase 1)

    REPD · 2515 · Orsted (formerly Dong Energy)/ Macquarie Group · Offshore · Offshore

Change history

  • May 2026

    30 Jul 2026 · DUKES · 573.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 289.8 MW · Counted