Capacity
289.8 MW
Grid ID ast_5b526ad9c1c70f86
What is Race Bank (Phase 1), and what is its status?
Offshore wind in East of England. Details below come from the sources listed for each field.
289.8 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
DUKES site
WOF-001256
Race Bank in DUKES.
REPD reference
2515
Race Bank (Phase 1) in REPD.
Same site
coordinate group
Same site in both registers, matched by coordinate group (high). REPD megawatts count. Distance 0 m.
Operator · DUKES
Orsted
DUKES records WOF-001256 as the operator.
Operator · REPD
Orsted (formerly Dong Energy)/ Macquarie Group
REPD records 2515 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Race Bank
DUKES · WOF-001256 · Orsted · East of England
Race Bank (Phase 1)
REPD · 2515 · Orsted (formerly Dong Energy)/ Macquarie Group · Offshore · Offshore
May 2026
30 Jul 2026 · DUKES · 573.0 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 289.8 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026