Capacity
7.0 MW
Grid ID ast_5c72cd83df8797ed
What is Levenmouth demonstration turbine (Fife Energy Park), and what is its status?
Offshore wind in Offshore. Details below come from the sources listed for each field.
7.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
2528
Levenmouth demonstration turbine (Fife Energy Park) in REPD.
Operator · REPD
Catapult
REPD records 2528 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Levenmouth demonstration turbine (Fife Energy Park)
REPD · 2528 · Catapult · Offshore · Offshore
REPD Q2 2026
3 Aug 2026 · REPD · 7.0 MW · Counted
REPD
REPD Q2 2026