Grid
Berwick solar farm: 8.2 MW Solar PV | Grid

Berwick solar farm

Solar PVOperational

Grid ID ast_6611a9f9c16349d9

View on map

What is Berwick solar farm, and what is its status?

Solar PV in South East England. Details below come from the sources listed for each field.

Capacity

8.2 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

50.85601, 0.17481

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    1963

    Berwick solar farm in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Susenco/Low Carbon

    REPD records 1963 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Berwick solar farm

    REPD · 1963 · Susenco/Low Carbon · South East · East Sussex

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 8.2 MW · Counted

Source records