Capacity
5.0 MW
Grid ID ast_6b1d6698cf3cf560
What is Potters Bar Solar Farm, and what is its status?
Solar PV in East England. Details below come from the sources listed for each field.
5.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
DUKES site
SOL-001220
Potters Bar in DUKES.
REPD reference
5660
Potters Bar Solar Farm in REPD.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.
Operator · DUKES
Greencoat Capital
DUKES records SOL-001220 as the operator.
Operator · REPD
UK Sustainable Energy
REPD records 5660 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Potters Bar
DUKES · SOL-001220 · Greencoat Capital · East of England
Potters Bar Solar Farm
REPD · 5660 · UK Sustainable Energy · Eastern · Hertfordshire
May 2026
30 Jul 2026 · DUKES · 5.0 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 5.0 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026