Grid
Caddington Solar Farm (Phase 2): 5 MW Solar PV | Grid

Caddington Solar Farm (Phase 2)

Solar PVOperational

Grid ID ast_74d67265f1e21bfd

View on map

What is Caddington Solar Farm (Phase 2), and what is its status?

Solar PV in East England. Details below come from the sources listed for each field.

Capacity

5.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

51.85640, -0.46865

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    4706

    Caddington Solar Farm (Phase 2) in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Emsrayne Limited

    REPD records 4706 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Caddington Solar Farm (Phase 2)

    REPD · 4706 · Emsrayne Limited · Eastern · Bedfordshire

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 5.0 MW · Counted

Source records