Royston Solar Farm (Phase 1) (a)

Solar PVOperational

Grid ID ast_82a54918522d6cdb

View on map

What is Royston Solar Farm (Phase 1) (a), and what is its status?

Solar PV in East England. Details below come from the sources listed for each field.

Capacity

5.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.06502, -0.02231

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    2202

    Royston Solar Farm (Phase 1) (a) in REPD.

  • DUKES site

    SOL-001111

    Royston in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Canadian Solar

    REPD records 2202 as the operator.

  • Operator · DUKES

    Greencoat Capital

    DUKES records SOL-001111 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Royston Solar Farm (Phase 1) (a)

    REPD · 2202 · Canadian Solar · Eastern · Cambridgeshire

  • Royston

    DUKES · SOL-001111 · Greencoat Capital · East of England

Change history

  • May 2026

    30 Jul 2026 · DUKES · 5.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 5.0 MW · Counted