Capacity
8.1 MW
Grid ID ast_97151bfb5734bd80
What is Land at Lower House Farm, and what is its status?
Solar PV in South Wales. Details below come from the sources listed for each field.
8.1 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
5006
Land at Lower House Farm in REPD.
DUKES site
SOL-001001
LowerHouse in DUKES.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 457 m.
Operator · REPD
3C Energy
REPD records 5006 as the operator.
Operator · DUKES
Greencoat Capital
DUKES records SOL-001001 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Land at Lower House Farm
REPD · 5006 · 3C Energy · Wales · Monmouthshire
LowerHouse
DUKES · SOL-001001 · Greencoat Capital · Wales
May 2026
30 Jul 2026 · DUKES · 8.2 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 8.1 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026