Capacity
5.0 MW
Grid ID ast_9b0960771a02f79d
What is Oulton Airfield Solar Farm (Phase 1), and what is its status?
Solar PV in East England. Details below come from the sources listed for each field.
5.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
1128
Oulton Airfield Solar Farm (Phase 1) in REPD.
Operator · REPD
Solar Century/ Bluefield Solar
REPD records 1128 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Oulton Airfield Solar Farm (Phase 1)
REPD · 1128 · Solar Century/ Bluefield Solar · Eastern · Norfolk
REPD Q2 2026
3 Aug 2026 · REPD · 5.0 MW · Counted
REPD
REPD Q2 2026