Grid
Blackstone Edge: 7.5 MW Onshore wind, Yorkshire | Grid

Blackstone Edge

Onshore windOperational

Grid ID ast_acf209c2a4d5850f

View on map

What is Blackstone Edge, and what is its status?

Onshore wind in Yorkshire. Details below come from the sources listed for each field.

Capacity

7.5 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.54331, -1.70622

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    3958

    Blackstone Edge in REPD.

  • DUKES site

    WON-000509

    Blackstone Edge in DUKES.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Ventient (formerly Infinis)

    REPD records 3958 as the operator.

  • Operator · DUKES

    Venitent Energy Services

    DUKES records WON-000509 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Blackstone Edge

    REPD · 3958 · Ventient (formerly Infinis) · Yorkshire and Humber · South Yorkshire

  • Blackstone Edge

    DUKES · WON-000509 · Venitent Energy Services · Yorkshire and the Humber

Change history

  • May 2026

    30 Jul 2026 · DUKES · 7.5 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 7.5 MW · Counted

Source records