Grid
Land at Meadow Farm: 5 MW Solar PV, East Midlands | Grid

Land at Meadow Farm

Solar PVOperational

Grid ID ast_ad8926fe4554c9ba

View on map

What is Land at Meadow Farm, and what is its status?

Solar PV in East Midlands. Details below come from the sources listed for each field.

Capacity

5.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.51726, -0.91987

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    SOL-001207

    Meadow Farm (Thorpe Lanton) in DUKES.

  • REPD reference

    5385

    Land at Meadow Farm in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 1119 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Lightsource BP

    DUKES records SOL-001207 as the operator.

  • Operator · REPD

    Lightsource Renewable Energy

    REPD records 5385 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Meadow Farm (Thorpe Lanton)

    DUKES · SOL-001207 · Lightsource BP · East Midlands

  • Land at Meadow Farm

    REPD · 5385 · Lightsource Renewable Energy · East Midlands · Leicestershire

Change history

  • May 2026

    30 Jul 2026 · DUKES · 5.0 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 5.0 MW · Counted

Source records