Garvinack Farm Solar Park: 7 MW Solar PV | Grid

Garvinack Farm Solar Park

Solar PVOperational

Grid ID ast_ae76636aa2d3ed41

View on map

What is Garvinack Farm Solar Park, and what is its status?

Solar PV in South West England. Details below come from the sources listed for each field.

Capacity

7.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

50.28972, -5.12072

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    SOL-000834

    Garvinack in DUKES.

  • REPD reference

    1897

    Garvinack Farm Solar Park in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 382 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Greencoat Capital

    DUKES records SOL-000834 as the operator.

  • Operator · REPD

    Lumicity

    REPD records 1897 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Garvinack

    DUKES · SOL-000834 · Greencoat Capital · South West

  • Garvinack Farm Solar Park

    REPD · 1897 · Lumicity · South West · Cornwall

Change history

  • May 2026

    30 Jul 2026 · DUKES · 9.6 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 7.0 MW · Counted

Source records