Grid
Carrington Farm AD: 3 MW Anaerobic digestion | Grid

Carrington Farm AD

Anaerobic digestionOperational

Grid ID ast_bd7dcfc42941d732

View on map

What is Carrington Farm AD, and what is its status?

Anaerobic digestion in East Midlands. Details below come from the sources listed for each field.

Capacity

3.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

53.07089, -0.05306

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    357

    Carrington Farm AD in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Beeswax Farming (Rainbow)

    REPD records 357 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Carrington Farm AD

    REPD · 357 · Beeswax Farming (Rainbow) · East Midlands · Lincolnshire

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 3.0 MW · Counted

Source records