Capacity
6.0 MW
Grid ID ast_bf5f342de134f3e0
What is Tangy Wind Farm Extension/Tangy 2, and what is its status?
Onshore wind in North Scotland. Details below come from the sources listed for each field.
6.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
4024
Tangy Wind Farm Extension/Tangy 2 in REPD.
Same site
name group
Same site in both registers, matched by name group (medium). REPD megawatts count. Distance 2445 m.
Operator · REPD
Scottish and Southern Energy (SSE)
REPD records 4024 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Tangy Wind Farm Extension/Tangy 2
REPD · 4024 · Scottish and Southern Energy (SSE) · Scotland · Strathclyde
REPD Q2 2026
3 Aug 2026 · REPD · 6.0 MW · Counted
REPD
REPD Q2 2026