Capacity
8.4 MW
Grid ID ast_c5a1d884c20e3a8c
What is Parc Cynog Extension, and what is its status?
Onshore wind in South Wales. Details below come from the sources listed for each field.
8.4 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
2950
Parc Cynog Extension in REPD.
Operator · REPD
Nuon
REPD records 2950 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Parc Cynog Extension
REPD · 2950 · Nuon · Wales · Dyfed
REPD Q2 2026
3 Aug 2026 · REPD · 8.4 MW · Counted
REPD
REPD Q2 2026