Grid
Snarlton Farm (Melksham solar farm): 49.6 MW Solar PV | Grid

Snarlton Farm (Melksham solar farm)

Solar PVOperational

Grid ID ast_cc9287ffc5c3fe01

View on map

What is Snarlton Farm (Melksham solar farm), and what is its status?

Solar PV in Southern England. Details below come from the sources listed for each field.

Capacity

49.6 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

51.37343, -2.08967

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    SOL-001308

    Sandridge in DUKES.

  • REPD reference

    1335

    Snarlton Farm (Melksham solar farm) in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Anesco

    DUKES records SOL-001308 as the operator.

  • Operator · REPD

    Foresight

    REPD records 1335 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Sandridge

    DUKES · SOL-001308 · Anesco · South West

  • Snarlton Farm (Melksham solar farm)

    REPD · 1335 · Foresight · South West · Wiltshire

Change history

  • May 2026

    30 Jul 2026 · DUKES · 49.6 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 49.6 MW · Counted

Source records