Grid
Broxted Solar Farm (Stradishall Ai…: 31.6 MW Solar PV | Grid

Broxted Solar Farm (Stradishall Airfield)

Solar PVOperational

Grid ID ast_dddc38402c24b67b

View on map

What is Broxted Solar Farm (Stradishall Airfield), and what is its status?

Solar PV in East England. Details below come from the sources listed for each field.

Capacity

31.6 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.13140, 0.51717

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    SOL-000629

    Broxted in DUKES.

  • REPD reference

    1592

    Broxted Solar Farm (Stradishall Airfield) in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Cubico Sustainable Investments

    DUKES records SOL-000629 as the operator.

  • Operator · REPD

    Lark Energy

    REPD records 1592 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Broxted

    DUKES · SOL-000629 · Cubico Sustainable Investments · East of England

  • Broxted Solar Farm (Stradishall Airfield)

    REPD · 1592 · Lark Energy · Eastern · Suffolk

Change history

  • May 2026

    30 Jul 2026 · DUKES · 31.6 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 31.6 MW · Counted

Source records