Capacity
1.2 MW
Grid ID ast_df01e5e7c1e3eb93
What is Green Waste Composting Facility (Waste AD), and what is its status?
Anaerobic digestion in Southern England. Details below come from the sources listed for each field.
1.2 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
259
Green Waste Composting Facility (Waste AD) in REPD.
Operator · REPD
Barfoot Energy Projects
REPD records 259 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Green Waste Composting Facility (Waste AD)
REPD · 259 · Barfoot Energy Projects · South East · Hampshire
REPD Q2 2026
3 Aug 2026 · REPD · 1.2 MW · Counted
REPD
REPD Q2 2026