Capacity
5.2 MW
Grid ID ast_df7235ebd706976f
What is Trimdon Grange, and what is its status?
Onshore wind in North East England. Details below come from the sources listed for each field.
5.2 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
Contains public sector information licensed under the Open Government Licence v3.0.
DUKES site
WON-000350
Trimdon in DUKES.
REPD reference
4690
Trimdon Grange in REPD.
Same site
coordinates
Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.
Operator · DUKES
EDF Energy
DUKES records WON-000350 as the operator.
Operator · REPD
Cumbria Wind Farms
REPD records 4690 as the operator.
Owner · DUKES, REPD
—
The register records an operator, not an owner.
Trimdon
DUKES · WON-000350 · EDF Energy · North East
Trimdon Grange
REPD · 4690 · Cumbria Wind Farms · North East · County Durham
May 2026
30 Jul 2026 · DUKES · 5.2 MW · Not counted
REPD Q2 2026
3 Aug 2026 · REPD · 5.2 MW · Counted
DUKES
May 2026
REPD
REPD Q2 2026