Grid
Grange Farm (Avon): 21 MW Solar PV | Grid

Grange Farm (Avon)

Solar PVOperational

Grid ID ast_eb1c7176e7341eb0

View on map

What is Grange Farm (Avon), and what is its status?

Solar PV in South West England. Details below come from the sources listed for each field.

Capacity

21.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

51.53971, -2.52275

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    SOL-000734

    Grange Farm in DUKES.

  • REPD reference

    1914

    Grange Farm (Avon) in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 147 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Greencoat Capital

    DUKES records SOL-000734 as the operator.

  • Operator · REPD

    Solar Power South

    REPD records 1914 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Grange Farm

    DUKES · SOL-000734 · Greencoat Capital · South West

  • Grange Farm (Avon)

    REPD · 1914 · Solar Power South · South West · Avon

Change history

  • May 2026

    30 Jul 2026 · DUKES · 21.1 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 21.0 MW · Counted

Source records