Tullymurdoch Wind Farm: 14.4 MW Onshore wind | Grid

Tullymurdoch Wind Farm

Onshore windOperational

Grid ID ast_f0ad2cf60d59de91

View on map

What is Tullymurdoch Wind Farm, and what is its status?

Onshore wind in North Scotland. Details below come from the sources listed for each field.

Capacity

14.4 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

56.65491, -3.31341

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • DUKES site

    WON-001267

    Tullymurdoch in DUKES.

  • REPD reference

    4599

    Tullymurdoch Wind Farm in REPD.

  • Same site

    coordinates

    Same site in both registers, matched by coordinates (high). REPD megawatts count. Distance 0 m.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · DUKES

    Temporis Capital

    DUKES records WON-001267 as the operator.

  • Operator · REPD

    Temporis Capital

    REPD records 4599 as the operator.

  • Owner · DUKES, REPD

    —

    The register records an operator, not an owner.

Related projects

  • Tullymurdoch

    DUKES · WON-001267 · Temporis Capital · Scotland

  • Tullymurdoch Wind Farm

    REPD · 4599 · Temporis Capital · Scotland · Tayside

Change history

  • May 2026

    30 Jul 2026 · DUKES · 14.2 MW · Not counted

  • REPD Q2 2026

    3 Aug 2026 · REPD · 14.4 MW · Counted