Capacity
5.0 MW
Grid ID ast_fcf9349f7f952b19
What is Solar Farm at Fields Farm (Phase 1), and what is its status?
Solar PV in East Midlands. Details below come from the sources listed for each field.
5.0 MW
Counted REPD megawatts
Published, approximate
Contains public sector information licensed under the Open Government Licence v3.0.
REPD reference
5244
Solar Farm at Fields Farm (Phase 1) in REPD.
Operator · REPD
Foresight Group (TGC Renewables)
REPD records 5244 as the operator.
Owner · REPD
—
The register records an operator, not an owner.
Solar Farm at Fields Farm (Phase 1)
REPD · 5244 · Foresight Group (TGC Renewables) · West Midlands · Warwickshire
REPD Q2 2026
3 Aug 2026 · REPD · 5.0 MW · Counted
REPD
REPD Q2 2026