Solar Farm at Fields Farm (Phase 1): 5 MW Solar PV | Grid

Solar Farm at Fields Farm (Phase 1)

Solar PVOperational

Grid ID ast_fcf9349f7f952b19

View on map

What is Solar Farm at Fields Farm (Phase 1), and what is its status?

Solar PV in East Midlands. Details below come from the sources listed for each field.

Capacity

5.0 MW

Capacity basis

Counted REPD megawatts

Location precision

Published, approximate

Location

Published, approximate
100 km

52.24493, -1.41022

Open in Map

Contains public sector information licensed under the Open Government Licence v3.0.

Identity and relationships

  • REPD reference

    5244

    Solar Farm at Fields Farm (Phase 1) in REPD.

Output

Grid does not have this data yet. It will appear here once Elexon BMU metering is added.

Ownership and operator

  • Operator · REPD

    Foresight Group (TGC Renewables)

    REPD records 5244 as the operator.

  • Owner · REPD

    —

    The register records an operator, not an owner.

Related projects

  • Solar Farm at Fields Farm (Phase 1)

    REPD · 5244 · Foresight Group (TGC Renewables) · West Midlands · Warwickshire

Change history

  • REPD Q2 2026

    3 Aug 2026 · REPD · 5.0 MW · Counted