Projects
Where is Aspire Leisure Centre, Wood Lane - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, London
Planning
- Planning
- Refused
- 19 Sep 2024
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_00a3c89c78dee072
Measures
- Rated power
- 0.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published