Grid

Projects

Projects

Where is Lochhead Landfill CHP up to?

Each status below comes from a named source and date.

Anaerobic digestion · Scotland

Planning

Planning
Granted
18 Aug 2011
DESNZ REPD, 3 Aug 2026
Construction
Built
1 Apr 2012
DESNZ REPD, 3 Aug 2026
Operational status
Operational
31 Mar 2014
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_021f91552b68300a

Measures

Rated power
1.7 MW
Connection capacity
Not published
Storage energy
Not published