Projects
Where is South Beach Parade/South Denes Rd up to?
Each status below comes from a named source and date.
Biomass · England, Eastern
Planning
- Planning
- Withdrawn
- 22 Dec 2016
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Biomass project, epj_025b2b3e9c25f36f
Measures
- Rated power
- 5.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published