Grid

Projects

Projects

Where is Fernbrook AD Plant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, East Midlands

Planning

Planning
Granted
22 Oct 2009
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Sep 2010
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_0d4c70cf36aa9ab3

Measures

Rated power
1.5 MW
Connection capacity
Not published
Storage energy
Not published