Grid

Projects

Projects

Where is Fawley Waste to Energy Plant up to?

Each status below comes from a named source and date.

Energy from waste · England, South East

Planning

Planning
Granted
1 Feb 2001
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Jun 2001
DESNZ REPD, 3 Aug 2026

Connection

Connection
Energy from waste project, epj_10cc6318a93c4add

Measures

Rated power
8.6 MW
Connection capacity
Not published
Storage energy
Not published