Grid

Projects

Projects

Where is Dagenham Docks Biogas (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, London

Planning

Planning
Granted
11 Nov 2013
DESNZ REPD, 3 Aug 2026
Construction
Built
1 Apr 2016
DESNZ REPD, 3 Aug 2026
Operational status
Operational
7 Jul 2017
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_16b8fa3a02be63ea

Measures

Rated power
1.4 MW
Connection capacity
Not published
Storage energy
Not published