Projects
Where is Peckham Pulse Leisure Centre, Melon Road - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, London
Planning
- Planning
- Granted
- 6 Jan 2025
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_17883ae91d83728c
Measures
- Rated power
- 0.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published