Grid

Projects

Projects

Where is Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Yorkshire and Humber

Planning

Planning
Granted
20 Nov 2013
DESNZ REPD, 3 Aug 2026
Construction
Built
18 Mar 2014
DESNZ REPD, 3 Aug 2026
Operational status
Operational
2 Jun 2015
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_19183459a167504c

Measures

Rated power
3.0 MW
Connection capacity
Not published
Storage energy
Not published