Grid

Projects

Projects

Where is Frog Island AD Plant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, London

Planning

Planning
Abandoned
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_1a6f5fc1e331dede

Measures

Rated power
5.0 MW
Connection capacity
Not published
Storage energy
Not published