Where is London Zoo, Outer Circle - Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, London

Planning

Planning
Granted
25 Apr 2025
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_1eed083bef5f95b1

Measures

Rated power
0.2 MW
Connection capacity
Not published
Storage energy
Not published